No. |
Name of project |
Location |
Scale of project/Legal background |
Total investment capital (estimated) |
Form of investment |
|
|
I- In the industrial sector: 03 groups of projects |
|||||||
1 |
Projects manufacturing textiles, garments, and leather shoes; food and beverage production and processing; mechanical manufacturing, super-long and super-weight factories; metal production and steel processing; downstream steel product production; producing civil electricity, multi-purpose electrical equipment and materials, electronics; supporting industries, and logistics. |
Binh Dong, Binh Thuan, Binh Thanh, Binh Chanh, Binh Hoa, Binh Thanh, Binh Phuoc (Binh Son District), Tinh Phong, Tinh Tho (Son Tinh District) |
The Management Unit of Dung Quat Economic Zone and Quang Ngai Industrial Parks proposes the following: - Area: 1,600 hectares - Belonging to the planning of: (1) the Industrial Area east of Dung Quat, (2) the Industrial Park west of Dung Quat, (3) VSIP Industrial Park, and (4) Binh Hoa-Binh Phuoc Industrial Park. - Belonging to the specific planning approved by the Provincial People’s Committee as shown in (1) Decision No. 44/QĐ-UBND dated 21 January 2013, (2) Decision No. 190/QĐ-UBND dated 24 November 2010, (3) Decision No. 132/QĐ-UBND dated 27 April 2015, and (4) Decision No. 278/QĐ-UBND dated 02 July 2014. |
To be proposed by Investors |
100%Investor capital |
|
|
2 |
Hi-tech industrial projects |
Binh Hoa Commune, Binh Son District |
The Management Unit of Dung Quat Economic Zone and Quang Ngai Industrial Parks proposes the following: - Area: 192 hectares - Belonging to the planning of Van Tuong Urban Area; - Belonging to the specific planning approved by the Provincial People’s Committee as shown in (1) Decision No. 259/QĐ-UBND dated 13 February 2009. - The Land Use Planning has been approved as shown in Decision No. 525/QĐ-UBND dated 28 June 2019 of the Provincial People’s Committee. |
To be proposed by Investors |
100% Investor capital |
|
|
3 |
Petrochemical and chemical production projects |
Binh Thuan Commune, Binh Son District |
The Management Unit of Dung Quat Economic Zone and Quang Ngai Industrial Parks proposes the following: - Area: 500 hectares - Belonging to the planning of the Industrial Park east of Dung Quat; - Belonging to the specific planning approved by the Provincial People’s Committee as shown in (1) Decision No. 44/QĐ-UBND dated 21 January 2013. - The Land Use Planning has been approved as shown in Decision No. 525/QĐ-UBND dated 28 June 2019 of the Provincial People’s Committee. |
To be proposed by Investors |
100% Investor capital |
|
|
4 |
Dung Quat IV mixed gas and turbine plant project (750MW) |
Dung Quat Electricity Centre in Binh Thanh Commune, Binh Son District, Quang Ngai Province |
The Management Unit of Dung Quat Economic Zone and Quang Ngai Industrial Parks proposes the following: - Area: 6.66 hectares, with a capacity of 750MW - Planning for the location of the Central Region Electrification Centre project has been approved by the Industry and Trade Ministry – Location: Dung Quat Electricity Centre as stated in Decision No. 2612/QĐ-BCT dated 25 July 2018 - Belonging to the detailed planning for construction of the Industrial Park west of Dung Quat (revised) approved by the Provincial People’s Committee as shown in Decision No. 190/QĐ-UBND dated 24 November 2010 and Dossier No. 206/UBND-CNXD dated 14 January 2019 of Quang Ngai Provincial People’s Committee regarding adjusting the planning for construction of the Industrial Park west of Dung Quat - The specific planning with the scale of 1/500 for construction of the infrastructure project for Dung Quat I, II and III Mixed Gas and Turbine Plant by the Management Unit of Dung Quat Economic Zone and Quang Ngai Industrial Parks as shown in Decision No. 137/QĐ-BQL dated 03 May 2019. -The land use plan has been approved by the Quang Ngai Province People’s Committee as shown in Decision No. 69/QĐ-UBND dated 24 January 2019 for the Central Region Electrification Centre project - Dung Quat Electricity Centre (93.3 hectares) |
To be proposed by Investors |
100% Investor capital |
|
|
5 |
An Vinh Tourism Service Area |
Ly Son District |
The People’s Committee of Ly Son District proposes the following: - Area: 20 hectares - Compatible with the construction planning, scale 1/2000 - With regard to the compatibility with the planning and Plan of land use, the People’s Committee of Ly Son District is developing the procedures to add to the district-level land use planning |
To be proposed by Investors |
100% Investor capital |
|
|
6 |
Dong Ho, An Hai Tourism Service Area |
Ly Son District |
The People’s Committee of Ly Son District proposes the following: - Area: 20 hectares - Compatible with the construction planning, scale 1/2000 - With regard to the compatibility with the planning and Plan of land use, the People’s Committee of Ly Son District is developing the procedures to add to the district-level land use planning |
To be proposed by Investors |
100% Investor capital |
|
|
7 |
Quang Ngai City Central Park project |
Tinh Khe Commune, Quang Ngai City |
The Construction Department proposes the following: - Area: 150 hectares - Compatible with the urban planning, the detailed planning 1/500 of the Quang Ngai City Central Park project has been approved by the Provincial People’s Committee in Decision No. 592/QĐ-UBND dated 09 July 2018. - With regard to the compatibility with the planning and Plan of land use, the Quang Ngai City Central Park is compatible with Quang Ngai City’s adjusted planning of land use till 2020 approved by the Provincial People’s Committee as shown in Decision No. 492/QĐ-UBND dated 28 June 2019. |
From the state budget and socialization |
|
||
8 |
Thach Bich Eco-tourism Area project |
Tra Binh Commune, Tra Bong District, and Binh Minh Commune, Binh Son District |
The Construction Department proposes the following: - Area: 200 hectares - Compatible with the construction planning, the duties and cost estimates of the detailed planning 1/2000 of the Thach Bich Eco-Tourism Area has been approved by the Provincial People’s Committee as shown in Decision No. 791/QĐ-UBND dated 19 November 2020. - With regard to the compatibility with the planning and Plan of land use, the People’s Committee of Tra Bong District is developing the procedures to add to the district-level land use planning. |
To be proposed by Investors |
100% Investor capital |
|
|
9 |
Ca Dam Eco-tourism Area project |
Tra Tan and Tra Bui in Tra Bong District |
The Construction Department proposes the following: - Area: 1,286 hectares, of which 300 hectares will be used for construction works and 986 hectares for forestry planning and creating the landscaping belt for the tourism area. - Compatible with the urban planning, the detailed planning project scale 1/500 for the Ca Dam Eco-tourism Resort Area has been approved by the Provincial People’s Committee as shown in Decision No. 346/QĐ-UBND dated 12 March 2013. - With regard to the compatibility with the planning and Plan of land use, it is not yet included in the land use planning of Tra Bong District. |
To be proposed by Investors |
100% Investor capital |
|
|
10 |
Tra Boi Eco-tourism Area project |
Tra Giang Commune, Tra Bong District |
The People’s Committee of Tra Bong District proposes the following: - Area: 40-50 hectares - Compatible with the provincial tourism planning.
- With regard to the compatibility with the planning and Plan of land use, the People’s Committee of Tra Bong District is developing the procedures to add to the district-level land use planning. |
To be proposed by Investors |
100% Investor capital |
|
|
III- In the field of infrastructure, traffic, and environment: 02 projects |
|||||||
11 |
Complex of residential solid waste treatment in Duc Pho Town |
Pho Nhon Commune, Duc Pho Town |
The People’s Committee of Duc Pho Town proposes the following: - Area: 17.95 hectares - Compatible with the provincial solid waste management planning.
- With regard to the compatibility with the planning and Plan of land use, the ,and use will be added to the land use planning of Duc Pho Town in the 2021-2030 period. |
To be proposed by Investors |
100% Investor capital |
|
|
12 |
Nghia Ky People's Cemetery.
|
Nghia Ky Commune, Tu Nghia District |
The People’s Committee of Tu Nghia District proposes the following: - Area: 15.37 hectares - This project is included in the proposed list of key projects involving the use of land of Quang Ngai Province in the 2021-2030 period as shown in Appendix No. 08, Report No. 270/BC-UBND dated 31 December 2020 of the Provincial People’s Committee. |
To be proposed by Investors |
100% Investor capital |
|
|
IV- In the field of urban areas, services - residential areas |
|||||||
13 |
Meyhomes Tinh Long Urban Area project;
|
Tinh Long Commune, Quang Ngai City |
The Investor and the Construction Department propose the following: - Area: 80-100 hectares - Compatible with the urban planning, the area is compatible with the adjusted master planning for construction of Quang Ngai City till 2030 approved by the Provincial People’s Committee as shown in Decision No. 2116/QD9-UBND dated 31 December 2020. - With regard to the compatibility with the planning and Plan of land use, it is not yet included in the planning involving the use of land of Quang Ngai City. |
To be proposed by Investors |
100% Investor capital |
|
|
14 |
Investment projects in worker housing, commercial housing; Investment in tourism, urban areas, resorts;
|
Communes including Binh Chanh, Binh Thanh, Binh Hai, Binh Tri, Binh Hoa, Binh Tan Phu (Binh Son District), Tinh Phong, Tinh Tho (Son Tinh District), Tinh Hoa (Quang Ngai City) |
The Management Unit of Dung Quat Economic Zone and Quang Ngai Industrial Parks proposes the following: - Area: 1,500 hectares - Belonging to the planning projects: (1) Doc Soi Urban Area, (2) Van Tuong Urban, (3) Tinh Phong Residential Area, and (4) Sa Ky Residential Area. - Belonging to the specific planning approved by the Provincial People’s Committee as shown in: (1) Decision No. 111/QĐ-UBND dated 26 April 2013, (2) Decision No. 259/QĐ-UBND dated 13 February 2009, (3) Decision No. 343/QĐ-UBND dated 16 October 2015, and (4) Decision No. 165/QĐ-UBND dated 09 July 2013. |
To be proposed by Investors |
100% Investor capital |
|
|
15 |
Dao Ngoc Urban Area project.
|
Truong Quang Trong Ward and Tinh An Commune in Quang Ngai City |
The Construction Department proposes the following: - Area: 187 hectares - Compatible with the construction planning, duties relating to the detailed planning of scale 1/500 for the Dao Ngoc Eco-urban area have been approved by the Provincial People’s Committee as shown in Decision No. 152/QĐ-UBND dated 13 March 2020. - With regard to the compatibility with the planning and Plan of land use, the Dao Ngoc Eco-urban Area is compatible with the adjusted planning involving the use of land of Quang Ngai City until 2020 approved by the Provincial People’s Committee as shown in Decision No. 492/QĐ-UBND dated 28 June 2019. |
To be proposed by Investors |
100% Investor capital |
|
|
I- In the industrial sector: 03 groups of projects |
|||||||
1 |
Projects manufacturing textiles, garments, and leather shoes; food and beverage production and processing; mechanical manufacturing, super-long and super-weight factories; metal production and steel processing; downstream steel product production; producing civil electricity, multi-purpose electrical equipment and materials, electronics; supporting industries, and logistics. |
Binh Dong, Binh Thuan, Binh Thanh, Binh Chanh, Binh Hoa, Binh Thanh, Binh Phuoc (Binh Son District), Tinh Phong, Tinh Tho (Son Tinh District) |
The Management Unit of Dung Quat Economic Zone and Quang Ngai Industrial Parks proposes the following: - Area: 1,600 hectares - Belonging to the planning of: (1) the Industrial Area east of Dung Quat, (2) the Industrial Park west of Dung Quat, (3) VSIP Industrial Park, and (4) Binh Hoa-Binh Phuoc Industrial Park. - Belonging to the specific planning approved by the Provincial People’s Committee as shown in (1) Decision No. 44/QĐ-UBND dated 21 January 2013, (2) Decision No. 190/QĐ-UBND dated 24 November 2010, (3) Decision No. 132/QĐ-UBND dated 27 April 2015, and (4) Decision No. 278/QĐ-UBND dated 02 July 2014. |
be proposed by Investors |
100%Investor capital |
|
|
2 |
Hi-tech industrial projects |
Binh Hoa Commune, Binh Son District |
The Management Unit of Dung Quat Economic Zone and Quang Ngai Industrial Parks proposes the following: - Area: 192 hectares - Belonging to the planning of Van Tuong Urban Area; - Belonging to the specific planning approved by the Provincial People’s Committee as shown in (1) Decision No. 259/QĐ-UBND dated 13 February 2009. - The Land Use Planning has been approved as shown in Decision No. 525/QĐ-UBND dated 28 June 2019 of the Provincial People’s Committee. |
To be proposed by Investors |
100% Investor capital |
|
|
3 |
Petrochemical and chemical production projects |
Binh Thuan Commune, Binh Son District |
The Management Unit of Dung Quat Economic Zone and Quang Ngai Industrial Parks proposes the following: - Area: 500 hectares - Belonging to the planning of the Industrial Park east of Dung Quat; - Belonging to the specific planning approved by the Provincial People’s Committee as shown in (1) Decision No. 44/QĐ-UBND dated 21 January 2013. - The Land Use Planning has been approved as shown in Decision No. 525/QĐ-UBND dated 28 June 2019 of the Provincial People’s Committee. |
To be proposed by Investors |
100% Investor capital |
|
|
4 |
Dung Quat IV mixed gas and turbine plant project (750MW) |
Dung Quat Electricity Centre in Binh Thanh Commune, Binh Son District, Quang Ngai Province |
The Management Unit of Dung Quat Economic Zone and Quang Ngai Industrial Parks proposes the following: - Area: 6.66 hectares, with a capacity of 750MW - Planning for the location of the Central Region Electrification Centre project has been approved by the Industry and Trade Ministry – Location: Dung Quat Electricity Centre as stated in Decision No. 2612/QĐ-BCT dated 25 July 2018 - Belonging to the detailed planning for construction of the Industrial Park west of Dung Quat (revised) approved by the Provincial People’s Committee as shown in Decision No. 190/QĐ-UBND dated 24 November 2010 and Dossier No. 206/UBND-CNXD dated 14 January 2019 of Quang Ngai Provincial People’s Committee regarding adjusting the planning for construction of the Industrial Park west of Dung Quat - The specific planning with the scale of 1/500 for construction of the infrastructure project for Dung Quat I, II and III Mixed Gas and Turbine Plant by the Management Unit of Dung Quat Economic Zone and Quang Ngai Industrial Parks as shown in Decision No. 137/QĐ-BQL dated 03 May 2019. -The land use plan has been approved by the Quang Ngai Province People’s Committee as shown in Decision No. 69/QĐ-UBND dated 24 January 2019 for the Central Region Electrification Centre project - Dung Quat Electricity Centre (93.3 hectares) |
To be proposed by Investors |
100% Investor capital |
|
|
5 |
An Vinh Tourism Service Area |
Ly Son District |
The People’s Committee of Ly Son District proposes the following: - Area: 20 hectares - Compatible with the construction planning, scale 1/2000 - With regard to the compatibility with the planning and Plan of land use, the People’s Committee of Ly Son District is developing the procedures to add to the district-level land use planning |
To be proposed by Investors |
100% Investor capital |
|
|
6 |
Dong Ho, An Hai Tourism Service Area |
Ly Son District |
The People’s Committee of Ly Son District proposes the following: - Area: 20 hectares - Compatible with the construction planning, scale 1/2000 - With regard to the compatibility with the planning and Plan of land use, the People’s Committee of Ly Son District is developing the procedures to add to the district-level land use planning |
To be proposed by Investors |
100% Investor capital |
|
|
7 |
Quang Ngai City Central Park project |
Tinh Khe Commune, Quang Ngai City |
The Construction Department proposes the following: - Area: 150 hectares - Compatible with the urban planning, the detailed planning 1/500 of the Quang Ngai City Central Park project has been approved by the Provincial People’s Committee in Decision No. 592/QĐ-UBND dated 09 July 2018. - With regard to the compatibility with the planning and Plan of land use, the Quang Ngai City Central Park is compatible with Quang Ngai City’s adjusted planning of land use till 2020 approved by the Provincial People’s Committee as shown in Decision No. 492/QĐ-UBND dated 28 June 2019. |
From the state budget and socialization |
|
||
8 |
Thach Bich Eco-tourism Area project |
Tra Binh Commune, Tra Bong District, and Binh Minh Commune, Binh Son District |
The Construction Department proposes the following: - Area: 200 hectares - Compatible with the construction planning, the duties and cost estimates of the detailed planning 1/2000 of the Thach Bich Eco-Tourism Area has been approved by the Provincial People’s Committee as shown in Decision No. 791/QĐ-UBND dated 19 November 2020. - With regard to the compatibility with the planning and Plan of land use, the People’s Committee of Tra Bong District is developing the procedures to add to the district-level land use planning. |
To be proposed by Investors |
100% Investor capital |
|
|
9 |
Ca Dam Eco-tourism Area project |
Tra Tan and Tra Bui in Tra Bong District |
The Construction Department proposes the following: - Area: 1,286 hectares, of which 300 hectares will be used for construction works and 986 hectares for forestry planning and creating the landscaping belt for the tourism area. - Compatible with the urban planning, the detailed planning project scale 1/500 for the Ca Dam Eco-tourism Resort Area has been approved by the Provincial People’s Committee as shown in Decision No. 346/QĐ-UBND dated 12 March 2013. - With regard to the compatibility with the planning and Plan of land use, it is not yet included in the land use planning of Tra Bong District. |
To be proposed by Investors |
100% Investor capital |
|
|
10 |
Tra Boi Eco-tourism Area project |
Tra Giang Commune, Tra Bong District |
The People’s Committee of Tra Bong District proposes the following: - Area: 40-50 hectares - Compatible with the provincial tourism planning. - With regard to the compatibility with the planning and Plan of land use, the People’s Committee of Tra Bong District is developing the procedures to add to the district-level land use planning. |
To be proposed by Investors |
100% Investor capital |
|
|
III- In the field of infrastructure, traffic, and environment: 02 projects |
|||||||
11 |
Complex of residential solid waste treatment in Duc Pho Town |
Pho Nhon Commune, Duc Pho Town |
The People’s Committee of Duc Pho Town proposes the following: - Area: 17.95 hectares - Compatible with the provincial solid waste management planning. - With regard to the compatibility with the planning and Plan of land use, the ,and use will be added to the land use planning of Duc Pho Town in the 2021-2030 period. |
To be proposed by Investors |
100% Investor capital |
|
|
12 |
Nghia Ky People's Cemetery.
|
Nghia Ky Commune, Tu Nghia District |
The People’s Committee of Tu Nghia District proposes the following: - Area: 15.37 hectares - This project is included in the proposed list of key projects involving the use of land of Quang Ngai Province in the 2021-2030 period as shown in Appendix No. 08, Report No. 270/BC-UBND dated 31 December 2020 of the Provincial People’s Committee. |
To be proposed by Investors |
100% Investor capital |
|
|
IV- In the field of urban areas, services - residential areas |
|||||||
13 |
Meyhomes Tinh Long Urban Area project;
|
Tinh Long Commune, Quang Ngai City |
The Investor and the Construction Department propose the following: - Area: 80-100 hectares - Compatible with the urban planning, the area is compatible with the adjusted master planning for construction of Quang Ngai City till 2030 approved by the Provincial People’s Committee as shown in Decision No. 2116/QD9-UBND dated 31 December 2020. - With regard to the compatibility with the planning and Plan of land use, it is not yet included in the planning involving the use of land of Quang Ngai City. |
To be proposed by Investors |
100% Investor capital |
|
|
14 |
Investment projects in worker housing, commercial housing; Investment in tourism, urban areas, resorts;
|
Communes including Binh Chanh, Binh Thanh, Binh Hai, Binh Tri, Binh Hoa, Binh Tan Phu (Binh Son District), Tinh Phong, Tinh Tho (Son Tinh District), Tinh Hoa (Quang Ngai City) |
The Management Unit of Dung Quat Economic Zone and Quang Ngai Industrial Parks proposes the following: - Area: 1,500 hectares - Belonging to the planning projects: (1) Doc Soi Urban Area, (2) Van Tuong Urban, (3) Tinh Phong Residential Area, and (4) Sa Ky Residential Area. - Belonging to the specific planning approved by the Provincial People’s Committee as shown in: (1) Decision No. 111/QĐ-UBND dated 26 April 2013, (2) Decision No. 259/QĐ-UBND dated 13 February 2009, (3) Decision No. 343/QĐ-UBND dated 16 October 2015, and (4) Decision No. 165/QĐ-UBND dated 09 July 2013. |
To be proposed by Investors |
100% Investor capital |
|
|
15 |
Dao Ngoc Urban Area project.
|
Truong Quang Trong Ward and Tinh An Commune in Quang Ngai City |
The Construction Department proposes the following: - Area: 187 hectares - Compatible with the construction planning, duties relating to the detailed planning of scale 1/500 for the Dao Ngoc Eco-urban area have been approved by the Provincial People’s Committee as shown in Decision No. 152/QĐ-UBND dated 13 March 2020. - With regard to the compatibility with the planning and Plan of land use, the Dao Ngoc Eco-urban Area is compatible with the adjusted planning involving the use of land of Quang Ngai City until 2020 approved by the Provincial People’s Committee as shown in Decision No. 492/QĐ-UBND dated 28 June 2019. |
To be proposed by Investors |
100% Investor capital |
|
ELECTRONIC INFORMATION PAGE FROM DUNG QUAT EZ AND QUANG NGAI INDUSTRIAL ZONES
Copyright by the Dung Quat Economic Zone and Quang Ngai Industrial Parks Authority | Quang Ngai Portal
Agency: Dung Quat Economic Zone and Quang Ngai Industrial Parks Authority.