No.

Name of project

Location

Scale of project/Legal background

Total investment capital (estimated)

Form of investment

 

I- In the industrial sector: 03 groups of projects

 

 

 

 

 

 

 

 

 

1

Projects manufacturing textiles, garments, and leather shoes; food and beverage production and processing; mechanical manufacturing, super-long and super-weight factories; metal production and steel processing; downstream steel product production; producing civil electricity, multi-purpose electrical equipment and materials, electronics; supporting industries, and logistics.

Binh Dong, Binh Thuan, Binh Thanh, Binh Chanh, Binh Hoa, Binh Thanh, Binh Phuoc (Binh Son District), Tinh Phong, Tinh Tho (Son Tinh District)

The Management Unit of Dung Quat Economic Zone and Quang Ngai Industrial Parks proposes the following:

- Area: 1,600 hectares

- Belonging to the planning of: (1) the Industrial Area east of Dung Quat, (2) the Industrial Park west of Dung Quat, (3) VSIP Industrial Park, and (4) Binh Hoa-Binh Phuoc Industrial Park.

- Belonging to the specific planning approved by the Provincial People’s Committee as shown in (1) Decision No. 44/QĐ-UBND dated 21 January 2013, (2) Decision No. 190/QĐ-UBND dated 24 November 2010, (3) Decision No. 132/QĐ-UBND dated 27 April 2015, and (4) Decision No. 278/QĐ-UBND dated 02 July 2014.

To be proposed

by Investors

100%Investor capital

 

2

Hi-tech industrial projects

Binh Hoa Commune, Binh Son District

The Management Unit of Dung Quat Economic Zone and Quang Ngai Industrial Parks proposes the following:

- Area: 192 hectares

- Belonging to the planning of Van Tuong Urban Area;

- Belonging to the specific planning approved by the Provincial People’s Committee as shown in (1) Decision No. 259/QĐ-UBND dated 13 February 2009.

- The Land Use Planning has been approved as shown in Decision No. 525/QĐ-UBND dated 28 June 2019 of the Provincial People’s Committee.

To be proposed

by Investors

100% Investor capital

 

3

Petrochemical and chemical production projects

Binh Thuan Commune, Binh Son District

The Management Unit of Dung Quat Economic Zone and Quang Ngai Industrial Parks proposes the following:

- Area: 500 hectares

- Belonging to the planning of the Industrial Park east of Dung Quat;

- Belonging to the specific planning approved by the Provincial People’s Committee as shown in (1) Decision No. 44/QĐ-UBND dated 21 January 2013.

- The Land Use Planning has been approved as shown in Decision No. 525/QĐ-UBND dated 28 June 2019 of the Provincial People’s Committee.

To be proposed

by Investors

100% Investor capital

 

4

Dung Quat IV mixed gas and turbine plant project (750MW)

Dung Quat Electricity Centre in Binh Thanh Commune, Binh Son District, Quang Ngai Province

The Management Unit of Dung Quat Economic Zone and Quang Ngai Industrial Parks proposes the following:

- Area: 6.66 hectares, with a capacity of 750MW

- Planning for the location of the Central Region Electrification Centre project has been approved by the Industry and Trade Ministry – Location: Dung Quat Electricity Centre as stated in Decision No. 2612/QĐ-BCT dated 25 July 2018

- Belonging to the detailed planning for construction of the Industrial Park west of Dung Quat (revised) approved by the Provincial People’s Committee as shown in  Decision No. 190/QĐ-UBND dated 24 November 2010 and Dossier No. 206/UBND-CNXD dated 14 January 2019 of Quang Ngai Provincial People’s Committee regarding adjusting the planning for construction of the Industrial Park west of Dung Quat

- The specific planning with the scale of 1/500 for construction of the infrastructure project for Dung Quat I, II and III Mixed Gas and Turbine Plant by the Management Unit of Dung Quat Economic Zone and Quang Ngai Industrial Parks as shown in Decision No. 137/QĐ-BQL dated 03 May 2019.

-The land use plan has been approved by the Quang Ngai Province People’s Committee as shown in Decision No. 69/QĐ-UBND dated 24 January 2019 for the Central Region Electrification Centre project - Dung Quat Electricity Centre (93.3 hectares) 

To be proposed

by Investors

100% Investor capital

 

5

An Vinh Tourism Service Area

Ly Son District

The People’s Committee of Ly Son District proposes the following:

- Area: 20 hectares

- Compatible with the construction planning, scale 1/2000

- With regard to the compatibility with the planning and Plan of land use, the People’s Committee of Ly Son District is developing the procedures to add to the district-level land use planning   

To be proposed

by Investors

100% Investor capital

 

6

Dong Ho, An Hai Tourism Service Area

Ly Son District

The People’s Committee of Ly Son District proposes the following:

- Area: 20 hectares

- Compatible with the construction planning, scale  1/2000

- With regard to the compatibility with the planning and Plan of land use, the People’s Committee of Ly Son District is developing the procedures to add to the district-level land use planning

To be proposed

by Investors

100% Investor capital

 

7

Quang Ngai City Central Park project

Tinh Khe Commune, Quang Ngai City

The Construction Department proposes the following:

- Area: 150 hectares

- Compatible with the urban planning, the detailed planning 1/500 of the Quang Ngai City Central Park project has been approved by the Provincial People’s Committee in Decision No. 592/QĐ-UBND dated 09 July  2018.

- With regard to the compatibility with the planning and Plan of land use, the Quang Ngai City Central Park is compatible with Quang Ngai City’s adjusted planning of land use till 2020 approved by the Provincial People’s Committee as shown in Decision No. 492/QĐ-UBND dated 28 June 2019.

From the state budget and socialization

 

8

Thach Bich Eco-tourism Area project

Tra Binh Commune, Tra Bong District, and Binh Minh Commune, Binh Son District

The Construction Department proposes the following:

- Area: 200 hectares

- Compatible with the construction planning, the duties and cost estimates  of the detailed planning 1/2000 of the Thach Bich Eco-Tourism Area has been approved by the Provincial People’s Committee as shown in Decision No. 791/QĐ-UBND dated 19 November 2020.

- With regard to the compatibility with the planning and Plan of land use, the People’s Committee of Tra Bong District is developing the procedures to add to the district-level land use planning. 

To be proposed

by Investors

100% Investor capital

 

9

Ca Dam Eco-tourism Area project

Tra Tan and Tra Bui in Tra Bong District

The Construction Department proposes the following:

- Area: 1,286 hectares, of which 300 hectares will be used for construction works and 986 hectares for forestry planning and creating the landscaping belt for the tourism area.

- Compatible with the urban planning, the detailed planning project scale 1/500 for the Ca Dam Eco-tourism Resort Area has been approved by the Provincial People’s Committee as shown in Decision No. 346/QĐ-UBND dated 12 March 2013.

- With regard to the compatibility with the planning and Plan of land use, it is not yet included in the land use planning of Tra Bong District. 

To be proposed

by Investors

100% Investor capital

 

10

Tra Boi Eco-tourism Area project

Tra Giang Commune, Tra Bong District

The People’s Committee of Tra Bong District proposes the following:

- Area: 40-50 hectares

- Compatible with the provincial tourism planning.

 

- With regard to the compatibility with the planning and Plan of land use, the People’s Committee of Tra Bong District is developing the procedures to add to the district-level land use planning.

To be proposed

by Investors

100% Investor capital

 

III- In the field of infrastructure, traffic, and environment: 02 projects

11

Complex of residential solid waste treatment in Duc Pho Town

Pho Nhon Commune, Duc Pho Town

The People’s Committee of Duc Pho Town proposes the following:

- Area: 17.95 hectares

- Compatible with the provincial solid waste management planning.

 

- With regard to the compatibility with the planning and Plan of land use, the ,and use will be added to the land use planning of Duc Pho Town in the 2021-2030 period. 

To be proposed

by Investors

100% Investor capital

 

12

Nghia Ky People's Cemetery.

 

Nghia Ky Commune, Tu Nghia District

The People’s Committee of Tu Nghia District proposes the following:

- Area: 15.37 hectares

- This project is included in the proposed list of key projects involving the use of land of Quang Ngai Province in the  2021-2030 period as shown in Appendix No. 08, Report No. 270/BC-UBND dated 31 December 2020 of the Provincial People’s Committee.

To be proposed

by Investors

100% Investor capital

 

IV- In the field of urban areas, services - residential areas

13

Meyhomes Tinh Long Urban Area project;

 

Tinh Long Commune, Quang Ngai City

The Investor and the Construction Department propose the following:

- Area: 80-100 hectares

- Compatible with the urban planning, the area is compatible with the adjusted master planning for construction of Quang Ngai City till 2030 approved by the Provincial People’s Committee as shown in Decision No. 2116/QD9-UBND dated 31 December 2020.

- With regard to the compatibility with the planning and Plan of land use, it is not yet included in the planning involving the use of land of Quang Ngai City.

To be proposed

by Investors

100% Investor capital

 

14

Investment projects in worker housing, commercial housing; Investment in tourism, urban areas, resorts;

 

Communes including Binh Chanh, Binh Thanh, Binh Hai, Binh Tri, Binh Hoa, Binh Tan Phu (Binh Son District), Tinh Phong, Tinh Tho  (Son Tinh District), Tinh Hoa (Quang Ngai City)

The Management Unit of Dung Quat Economic Zone and Quang Ngai Industrial Parks proposes the following:

- Area: 1,500 hectares

- Belonging to the planning projects: (1) Doc Soi Urban Area, (2) Van Tuong Urban, (3) Tinh Phong Residential Area, and (4) Sa Ky Residential Area.

- Belonging to the specific planning approved by the Provincial People’s Committee as shown in: (1) Decision No. 111/QĐ-UBND dated 26 April 2013, (2) Decision No. 259/QĐ-UBND dated 13 February 2009, (3) Decision No. 343/QĐ-UBND dated 16 October 2015, and (4) Decision No. 165/QĐ-UBND dated 09 July 2013.

To be proposed

by Investors

100% Investor capital

 

15

Dao Ngoc Urban Area project.

 

Truong Quang Trong Ward and Tinh An Commune in Quang Ngai City

The Construction Department proposes the following:

- Area: 187 hectares

- Compatible with the construction  planning, duties relating to the detailed planning of scale 1/500 for the Dao Ngoc Eco-urban area have been approved by the Provincial People’s Committee as shown in Decision No. 152/QĐ-UBND dated 13 March 2020.

- With regard to the compatibility with the planning and Plan of land use, the Dao Ngoc Eco-urban Area is compatible with the adjusted planning involving the use of land of Quang Ngai City until 2020 approved by the Provincial People’s Committee as shown in Decision No. 492/QĐ-UBND dated 28 June 2019.

To be proposed

by Investors

100% Investor capital

 

I- In the industrial sector: 03 groups of projects

 

 

 

 

 

 

 

 

 

1

Projects manufacturing textiles, garments, and leather shoes; food and beverage production and processing; mechanical manufacturing, super-long and super-weight factories; metal production and steel processing; downstream steel product production; producing civil electricity, multi-purpose electrical equipment and materials, electronics; supporting industries, and logistics.

Binh Dong, Binh Thuan, Binh Thanh, Binh Chanh, Binh Hoa, Binh Thanh, Binh Phuoc (Binh Son District), Tinh Phong, Tinh Tho (Son Tinh District)

The Management Unit of Dung Quat Economic Zone and Quang Ngai Industrial Parks proposes the following:

- Area: 1,600 hectares

- Belonging to the planning of: (1) the Industrial Area east of Dung Quat, (2) the Industrial Park west of Dung Quat, (3) VSIP Industrial Park, and (4) Binh Hoa-Binh Phuoc Industrial Park.

- Belonging to the specific planning approved by the Provincial People’s Committee as shown in (1) Decision No. 44/QĐ-UBND dated 21 January 2013, (2) Decision No. 190/QĐ-UBND dated 24 November 2010, (3) Decision No. 132/QĐ-UBND dated 27 April 2015, and (4) Decision No. 278/QĐ-UBND dated 02 July 2014.

 be proposed

by Investors

100%Investor capital

 

2

Hi-tech industrial projects

Binh Hoa Commune, Binh Son District

The Management Unit of Dung Quat Economic Zone and Quang Ngai Industrial Parks proposes the following:

- Area: 192 hectares

- Belonging to the planning of Van Tuong Urban Area;

- Belonging to the specific planning approved by the Provincial People’s Committee as shown in (1) Decision No. 259/QĐ-UBND dated 13 February 2009.

- The Land Use Planning has been approved as shown in Decision No. 525/QĐ-UBND dated 28 June 2019 of the Provincial People’s Committee.

To be proposed

by Investors

100% Investor capital

 

3

Petrochemical and chemical production projects

Binh Thuan Commune, Binh Son District

The Management Unit of Dung Quat Economic Zone and Quang Ngai Industrial Parks proposes the following:

- Area: 500 hectares

- Belonging to the planning of the Industrial Park east of Dung Quat;

- Belonging to the specific planning approved by the Provincial People’s Committee as shown in (1) Decision No. 44/QĐ-UBND dated 21 January 2013.

- The Land Use Planning has been approved as shown in Decision No. 525/QĐ-UBND dated 28 June 2019 of the Provincial People’s Committee.

To be proposed

by Investors

100% Investor capital

 

4

Dung Quat IV mixed gas and turbine plant project (750MW)

Dung Quat Electricity Centre in Binh Thanh Commune, Binh Son District, Quang Ngai Province

The Management Unit of Dung Quat Economic Zone and Quang Ngai Industrial Parks proposes the following:

- Area: 6.66 hectares, with a capacity of 750MW

- Planning for the location of the Central Region Electrification Centre project has been approved by the Industry and Trade Ministry – Location: Dung Quat Electricity Centre as stated in Decision No. 2612/QĐ-BCT dated 25 July 2018

- Belonging to the detailed planning for construction of the Industrial Park west of Dung Quat (revised) approved by the Provincial People’s Committee as shown in  Decision No. 190/QĐ-UBND dated 24 November 2010 and Dossier No. 206/UBND-CNXD dated 14 January 2019 of Quang Ngai Provincial People’s Committee regarding adjusting the planning for construction of the Industrial Park west of Dung Quat

- The specific planning with the scale of 1/500 for construction of the infrastructure project for Dung Quat I, II and III Mixed Gas and Turbine Plant by the Management Unit of Dung Quat Economic Zone and Quang Ngai Industrial Parks as shown in Decision No. 137/QĐ-BQL dated 03 May 2019.

-The land use plan has been approved by the Quang Ngai Province People’s Committee as shown in Decision No. 69/QĐ-UBND dated 24 January 2019 for the Central Region Electrification Centre project - Dung Quat Electricity Centre (93.3 hectares) 

To be proposed

by Investors

100% Investor capital

 

5

An Vinh Tourism Service Area

Ly Son District

The People’s Committee of Ly Son District proposes the following:

- Area: 20 hectares

- Compatible with the construction planning, scale 1/2000

- With regard to the compatibility with the planning and Plan of land use, the People’s Committee of Ly Son District is developing the procedures to add to the district-level land use planning   

To be proposed

by Investors

100% Investor capital

 

6

Dong Ho, An Hai Tourism Service Area

Ly Son District

The People’s Committee of Ly Son District proposes the following:

- Area: 20 hectares

- Compatible with the construction planning, scale  1/2000

- With regard to the compatibility with the planning and Plan of land use, the People’s Committee of Ly Son District is developing the procedures to add to the district-level land use planning

To be proposed

by Investors

100% Investor capital

 

7

Quang Ngai City Central Park project

Tinh Khe Commune, Quang Ngai City

The Construction Department proposes the following:

- Area: 150 hectares

- Compatible with the urban planning, the detailed planning 1/500 of the Quang Ngai City Central Park project has been approved by the Provincial People’s Committee in Decision No. 592/QĐ-UBND dated 09 July  2018.

- With regard to the compatibility with the planning and Plan of land use, the Quang Ngai City Central Park is compatible with Quang Ngai City’s adjusted planning of land use till 2020 approved by the Provincial People’s Committee as shown in Decision No. 492/QĐ-UBND dated 28 June 2019.

From the state budget and socialization

 

8

Thach Bich Eco-tourism Area project

Tra Binh Commune, Tra Bong District, and Binh Minh Commune, Binh Son District

The Construction Department proposes the following:

- Area: 200 hectares

- Compatible with the construction planning, the duties and cost estimates  of the detailed planning 1/2000 of the Thach Bich Eco-Tourism Area has been approved by the Provincial People’s Committee as shown in Decision No. 791/QĐ-UBND dated 19 November 2020.

- With regard to the compatibility with the planning and Plan of land use, the People’s Committee of Tra Bong District is developing the procedures to add to the district-level land use planning. 

To be proposed

by Investors

100% Investor capital

 

9

Ca Dam Eco-tourism Area project

Tra Tan and Tra Bui in Tra Bong District

The Construction Department proposes the following:

- Area: 1,286 hectares, of which 300 hectares will be used for construction works and 986 hectares for forestry planning and creating the landscaping belt for the tourism area.

- Compatible with the urban planning, the detailed planning project scale 1/500 for the Ca Dam Eco-tourism Resort Area has been approved by the Provincial People’s Committee as shown in Decision No. 346/QĐ-UBND dated 12 March 2013.

- With regard to the compatibility with the planning and Plan of land use, it is not yet included in the land use planning of Tra Bong District. 

To be proposed

by Investors

100% Investor capital

 

10

Tra Boi Eco-tourism Area project

Tra Giang Commune, Tra Bong District

The People’s Committee of Tra Bong District proposes the following:

- Area: 40-50 hectares

- Compatible with the provincial tourism planning.

- With regard to the compatibility with the planning and Plan of land use, the People’s Committee of Tra Bong District is developing the procedures to add to the district-level land use planning.

To be proposed

by Investors

100% Investor capital

 

III- In the field of infrastructure, traffic, and environment: 02 projects

11

Complex of residential solid waste treatment in Duc Pho Town

Pho Nhon Commune, Duc Pho Town

The People’s Committee of Duc Pho Town proposes the following:

- Area: 17.95 hectares

- Compatible with the provincial solid waste management planning.

- With regard to the compatibility with the planning and Plan of land use, the ,and use will be added to the land use planning of Duc Pho Town in the 2021-2030 period. 

To be proposed

by Investors

100% Investor capital

 

12

Nghia Ky People's Cemetery.

 

Nghia Ky Commune, Tu Nghia District

The People’s Committee of Tu Nghia District proposes the following:

- Area: 15.37 hectares

- This project is included in the proposed list of key projects involving the use of land of Quang Ngai Province in the  2021-2030 period as shown in Appendix No. 08, Report No. 270/BC-UBND dated 31 December 2020 of the Provincial People’s Committee.

To be proposed

by Investors

100% Investor capital

 

IV- In the field of urban areas, services - residential areas

13

Meyhomes Tinh Long Urban Area project;

 

Tinh Long Commune, Quang Ngai City

The Investor and the Construction Department propose the following:

- Area: 80-100 hectares

- Compatible with the urban planning, the area is compatible with the adjusted master planning for construction of Quang Ngai City till 2030 approved by the Provincial People’s Committee as shown in Decision No. 2116/QD9-UBND dated 31 December 2020.

- With regard to the compatibility with the planning and Plan of land use, it is not yet included in the planning involving the use of land of Quang Ngai City.

To be proposed

by Investors

100% Investor capital

 

14

Investment projects in worker housing, commercial housing; Investment in tourism, urban areas, resorts;

 

Communes including Binh Chanh, Binh Thanh, Binh Hai, Binh Tri, Binh Hoa, Binh Tan Phu (Binh Son District), Tinh Phong, Tinh Tho  (Son Tinh District), Tinh Hoa (Quang Ngai City)

The Management Unit of Dung Quat Economic Zone and Quang Ngai Industrial Parks proposes the following:

- Area: 1,500 hectares

- Belonging to the planning projects: (1) Doc Soi Urban Area, (2) Van Tuong Urban, (3) Tinh Phong Residential Area, and (4) Sa Ky Residential Area.

- Belonging to the specific planning approved by the Provincial People’s Committee as shown in: (1) Decision No. 111/QĐ-UBND dated 26 April 2013, (2) Decision No. 259/QĐ-UBND dated 13 February 2009, (3) Decision No. 343/QĐ-UBND dated 16 October 2015, and (4) Decision No. 165/QĐ-UBND dated 09 July 2013.

To be proposed

by Investors

100% Investor capital

 

15

Dao Ngoc Urban Area project.

 

Truong Quang Trong Ward and Tinh An Commune in Quang Ngai City

The Construction Department proposes the following:

- Area: 187 hectares

- Compatible with the construction  planning, duties relating to the detailed planning of scale 1/500 for the Dao Ngoc Eco-urban area have been approved by the Provincial People’s Committee as shown in Decision No. 152/QĐ-UBND dated 13 March 2020.

- With regard to the compatibility with the planning and Plan of land use, the Dao Ngoc Eco-urban Area is compatible with the adjusted planning involving the use of land of Quang Ngai City until 2020 approved by the Provincial People’s Committee as shown in Decision No. 492/QĐ-UBND dated 28 June 2019.

To be proposed

by Investors

100% Investor capital

 

Foreword Warmly welcome readers to Dung Quat Economic Zone and Quang Ngai Industrial Parks Authority portal. Dung Quat Economic Zone and Quang Ngai Industrial Parks Authority (DEZA) was established on the basis of consolidating of Dung Quat Economic Zone Authority [...] See more

Online: -

Total Visits: -

ELECTRONIC INFORMATION PAGE FROM DUNG QUAT EZ AND QUANG NGAI INDUSTRIAL ZONES

Copyright by the Dung Quat Economic Zone and Quang Ngai Industrial Parks Authority | Quang Ngai Portal

Agency: Dung Quat Economic Zone and Quang Ngai Industrial Parks Authority.
Editor: Mr.Dam Minh Le - Vice Chairman